APC/JBC GAS PIPELINE PROJECT
Earth Works: Construction of 26,000 meters length (208,000 m2) Right of way including cutting, filling, grading, dozing, in addition to 120,000 m3 imported materials for stabilization.
Earth Works: Trench excavation for 26,000 KM pipe line in various types of soil (Mud, Sand, Clay, rock, etc…), 16,000 km located below water table by 1.0 meters. Works include bedding, padding with soft sand for quantity of (65,000 m3), and trench backfilling and reinstatement works.
De-watering activities include installation of temporary pumps, shoring and continuous operation. for 16 km trenching, 24/7.
Structural works: construction of all structural works for two gas receiving stations, and one intermediate block valve with area of 6,250 m2. Work includes concrete foundations, steel structure works, fencing, internal infrastructures (roads, curb stones, and landscaping).
Main Contractor: GUNSAYIL Insaat Ticaretve Sanayi LTD. STI.
Contract Value: 12,770,452 USD
ConEx Share: 2,216,000 USD
Date of Start: 01.05.2015
Year Completed: 2016
Location: Dead Sea– Jordan